I select Currency Defined by Project for a an Edit Control.The Project is set to use the system default. My understanding is that this will look at the System setting and use the default format. My system setting format is basically $9,999.99. My Edit Control displays 75.00. There is no $ sign in front of it.
Any help is appreciated.
When I input my own mask $9,999.99. It works fine.
On a side note: does it make any difference whether I type the file item as numeric or currency in the Anaylsis. I have tried both and there has been no difference in the result.
Thanks,
Paul